Raycap News

Arlington County Has Approved This 5G Small Cell Pole Design for All Carriers

Just one pole design has been approved for all 5G small cells across Arlington County, the second-largest “principal city” in the Washington D.C. area. It’s the result of collaboration among three tier-one carriers, the county and the local utility—led by Raycap.

Read the case study: How Carriers, Counties and Utilities Can Collaborate to Streamline 5G Deployment.

During the process, our engineers balanced the needs of all parties.

  • Wireless equipment and coverage requirements for multiple carriers
  • Dimensional and cosmetic specifications of the county
  • Engineering and maintenance restrictions for the utility

Raycap can help you meet municipality and utility requirements and get your 5G small cell poles into service. This case study explains how. Download it today.

download case study